Fournisseur mondial de solutions en énergie renouvelable

  • 01/02/16 With the recent historic signing of the Paris COP21 agreement, we are moving into a new generation where clean, renewable energy will become the focus for sustainability and economic growth for nations across the globe. Read more
  • Vergnet Repowers Petite Place Wind Farm, Guadeloupe

    01/02/16 Vergnet recently commissioned the modernisation of The Petite Place wind farm, originally installed in 1997, to deliver a higher amount of energy in the Guadeloupe Region for its key customer Eole Marie Galante. Read more
  • France Ranked Top Nation for Climate Change in New Climate Action Network Europe Report

    08/01/16 Climate Action NetworkThe recently published Climate Action Network (CAN) Europe, which indicates the best preforming nations in tackling climate change across the world, has ranked Vergnet’s home country, France, in the top 10 for climate action. Read more
  • Non-state Actors Pledge For Action Following COP21

    06/01/16 With 195 nations declaring their support for a final agreement to combat climate change at the United Nation Climate Change Conference (COP21), non-state actors have pledged to take steps to ensure that the new global deal to keep the world’s ... Read more

Catégories

Regions

Afrique
Asie
Europe
Iles
Amérique du sud
USA

Four Vergnet MP-R 275kW wind turbines are producing clean, green energy along the I-90 freeway in New York State

Vergnet completed a significant US project in New York State this April with a total of four MP-R 275kW turbines now producing clean, green renewable energy on the Interstate 90 (I-90) freeway.

The I-90 is a transcontinental freeway, and the longest Interstate Highway in the United States at 3,020.54 miles (4,861.09 km).

The project, developed for the New York State Thruway Authority, was signed in July 2013 followed by construction, installation and commissioning in November 2014. It is part of a New York state initiative to utilise more renewal energy with an overall goal of generating 30 percent of energy from renewables.

Crucially, all of the grid-connected turbines are equipped with Vergnet’s polar package to deal with the extremely low temperatures often experienced in the area in winter.

Following commissioning late last year, the turbines were put to the test, performing well during a particularly cold winter in New York.

The completion of this latest project affirms Vergnet’s place as a market leader in the medium wind sector with the ability to meet the needs of a range of distributed generation projects needs including hurricane prone islands and cold weather conditions.

In fact, the USA is the first country worldwide to contain all current Vergnet turbine models.