Fournisseur mondial de solutions en énergie renouvelable

  • VERGNET attended the 3rd national photovoltaic (PV) conference

    14/03/17VERGNET attended the 3rd national photovoltaic (PV) conferenceMarch 9th, VERGNET attended the 3rd national photovoltaic conference in Lyon which topic was “Solar PV power: the new deal of energy”. Ségolène Royal, the French Minister of Energy, Environmental and Sustainable Development (repented by the vice-director of renewable energy ...Read more
  • VERGNET to attend INVESTING IN AFRICA MINING INDABA

    01/02/17VERGNET to attend INVESTING IN AFRICA MINING INDABAFrom 6th to 9th February, VERGNET will attend the INVESTING IN AFRICA MINING INDABA Conference in Cape Town. MINING INDABA is the largest professional conference in Africa dedicated to the capitalisation and development of mining interests on the continent. The theme ...Read more
  • Powering Africa to Bring Energy Focus to Nigeria

    13/10/16Powering Africa to Bring Energy Focus to NigeriaEnergy event Powering Africa 2016, is taking place in Abuja, Nigeria from 12th-14th October 2016 and will bring the focus of energy experts to Nigeria. Read more
  • Vergnet to Attend Conferences in Kenya

    28/09/16Vergnet to Attend Conferences in KenyaVergnet will be participating at the Kenya-France Energy Workshop from 27th – 29th September 2016 and International Off-Grid Renewable Energy Conference from 30th September – 1st October 2016. Read more

Catégories

Regions

Afrique
Asie
Europe
Iles
Amérique du sud
USA

Four Vergnet MP-R 275kW wind turbines are producing clean, green energy along the I-90 freeway in New York State

Vergnet completed a significant US project in New York State this April with a total of four MP-R 275kW turbines now producing clean, green renewable energy on the Interstate 90 (I-90) freeway.

The I-90 is a transcontinental freeway, and the longest Interstate Highway in the United States at 3,020.54 miles (4,861.09 km).

The project, developed for the New York State Thruway Authority, was signed in July 2013 followed by construction, installation and commissioning in November 2014. It is part of a New York state initiative to utilise more renewal energy with an overall goal of generating 30 percent of energy from renewables.

Crucially, all of the grid-connected turbines are equipped with Vergnet’s polar package to deal with the extremely low temperatures often experienced in the area in winter.

Following commissioning late last year, the turbines were put to the test, performing well during a particularly cold winter in New York.

The completion of this latest project affirms Vergnet’s place as a market leader in the medium wind sector with the ability to meet the needs of a range of distributed generation projects needs including hurricane prone islands and cold weather conditions.

In fact, the USA is the first country worldwide to contain all current Vergnet turbine models.